The project is a cooperative effort between the St. Charles County Highway Department and the Missouri Department of Transportation (MoDOT) to facilitate traffic flow, improve safety, and provide pedestrian and bicycle access. The project includes:

  • New pavement, three lanes wide.
  • An oversized sidewalk / trail on both sides of the road.
  • Enclosed drainage.
  • A new traffic signal at the intersection of Gutermuth Road and Motherhead Road.

The project, funded by St. Charles County and the Federal Highway Administration (FHWA) with GBA, Inc., serving as engineering consultant, is estimated to cost approximately $3.4 million. Design and right-of-way acquisition is tentatively expected to be complete by early 2021 and construction is expected to begin soon after.

Contact Chris Bostic, Engineering Design Manager, at 636-949-7305 or cbostic@sccmo.org, with questions about the project. 