The project involves the replacement of a deficient steel girder bridge on Femme Osage Creek Road over a tributary to Femme Osage Creek, located 0.1 miles east of Becker-Joerling Road. Proposed improvements include:
- New widener structure to provide for 12-foot lanes and 4-foot shoulders.
- Realignment to allow old bridge to remain in place while new structure is constructed.
The project is funded by St. Charles County’s ½-cent Transportation Sales Tax and with Federal Highway Administration (FHWA) Surface Transportation Program-Suballocated (STP-S) funding. The project is estimated to cost approximately $760,000.
Contact Chris Bostic, Engineering Design Manager, at 636-949-7305 or cbostic@sccmo.org, with questions about the project.
Current Phase
Design by Bartlett & West began early in 2022. Construction is scheduled for 2024. The consultant has completed surveying and Conceptual Plans. Preliminary Plans for a multi-cell box culvert were reviewed by the County at the end of September. The consultant is now working on Right-of-Way Plans and environmental clearances.
Updated 12/15/22